How to calculate OEE, with a worked example

Overall equipment effectiveness (OEE) measures how much of the time a machine was scheduled to run turned into good parts at full speed. It multiplies three ratios: availability, performance and quality. Here is a full shift calculated by hand, then turned into lost minutes, which is the form that helps you decide what to fix.

The three factors

Availability = run time / planned production time Performance = (ideal cycle time × total count) / run time Quality = good count / total count OEE = availability × performance × quality

Planned production time is the shift minus planned stops such as breaks and scheduled maintenance. Run time is planned time minus unplanned stops: breakdowns, changeovers, waiting for material. The ideal cycle time is the fastest the machine is designed to make one part.

Worked example: a bottle-capping machine

Data from one shift:

  • Planned production time: 480 minutes (an 8.5-hour shift minus a 30-minute break).
  • Unplanned downtime: 60 minutes (a jam, a late material delivery and a changeover that ran long).
  • Ideal cycle time: 2.5 seconds per bottle.
  • Bottles produced: 9,000, of which 270 were rejected.

Availability

Run time = 480 − 60 = 420 minutes. Availability = 420 / 480 = 87.5%.

Performance

At the ideal speed, 9,000 bottles would take 9,000 × 2.5 s = 22,500 s = 375 minutes. The machine had 420 minutes. Performance = 375 / 420 = 89.3%.

Quality

Good bottles = 9,000 − 270 = 8,730. Quality = 8,730 / 9,000 = 97%.

OEE

OEE = 0.875 × 0.893 × 0.97 = 75.8%.

A quick cross-check: OEE is also the share of planned time spent making good parts at ideal speed. 8,730 good bottles × 2.5 s = 363.75 minutes, and 363.75 / 480 = 75.8%. Same answer.

Turn the percentages into lost minutes

A single OEE figure does not tell anyone what to do on Monday. Splitting the gap into minutes does:

LossMinutesWhere it comes from
Availability60Breakdowns, changeovers, waiting for material
Speed45Running below ideal speed, short stops nobody logs
Quality11.25Time spent making bottles that were rejected
Good production363.75Out of 480 planned minutes

The biggest loss here is downtime, 60 minutes. The 45 minutes of speed loss deserve a look too: they often hide dozens of one-minute micro-stops that operators clear without recording. Quality is a small loss on this machine, so effort spent there would move OEE least.

What is a good OEE?

The figure usually quoted as “world class” is 85%, built from roughly 90% availability, 95% performance and 99.9% quality. Many plants run between 60% and 75% when they first measure with strict definitions. At 75.8%, this machine is in the typical range, and the table above shows where the next ten points would come from.

Compare a machine with itself over time rather than with other plants. Small differences in how downtime and ideal speed are defined move OEE by several points.

Common mistakes

  • Using the average speed as ideal cycle time. That sets performance to about 100% by definition and hides the speed loss. Use the design speed or the best sustained speed ever achieved.
  • Treating changeovers as planned stops. Changeovers are part of the job and part of the improvement opportunity. Count them as downtime.
  • Counting reworked parts as good. A part that needed rework did not come out right the first time. Count it as a reject for quality.
  • Averaging OEE across machines. Average the minutes, not the percentages, or a small machine with a high score hides a big one with a low score.
  • Performance above 100%. If you see it, the ideal cycle time is wrong.

Run your own numbers

The free OEE Calculator does this math as you type and shows each step. No sign-up, and your numbers stay in your browser.

Frequently asked questions

What is the OEE formula?

OEE = availability × performance × quality, where availability = run time / planned time, performance = ideal cycle time × total count / run time, and quality = good count / total count.

What is a world-class OEE?

About 85%, made of roughly 90% availability, 95% performance and 99.9% quality. Plants measuring for the first time often find 60% to 75%.

Should breaks be included in OEE?

No. Planned production time excludes planned breaks and scheduled stops where nobody expects the machine to run. Unplanned stops, including changeovers, count against availability.

What is the difference between OEE and TEEP?

OEE uses planned production time as the base. TEEP uses all calendar time (24 hours a day, 7 days a week), so it also reflects how much of the week the machine is scheduled at all.

How often should I calculate OEE?

Per shift for the machines that limit your output, then look at the weekly trend. A single shift can be noisy. The loss breakdown over a few weeks shows where to focus.

Elio Saliba is an industrial engineering student at LAU in Lebanon. He builds and tests every calculator on this site. About the site